The Kitchen Remodeling Timeline

Updated: Sep 28, 2022

modern kitchen

If you are thinking about remodeling your kitchen the best place to start is with a plan. We compiled the basic steps you need to take to make your dream kitchen a reality.

  1. Retain the services of a General Contractor. Retain the services of an Architect (if needed)

  2. Finalize the Plans and Drawings of your Project

  3. Submit plans and drawings and apply for permits

  4. Demolition of existing kitchen

  5. Begin structural changes e.g. framing, windows, walls, doors, etc.

  6. HVAC work begins (ventilation above range)

  7. Electrical (lighting, switches, electrical outlets, upgrade of panel if needed) - our electrical services

  8. Plumbing (plumbing for sink, dishwasher, waterline for refrigerator, garbage disposer) - our pluming services

  9. Insulation/Drywall as needed

  10. Texturing (if opted), Painting of Walls

  11. Installation of Kitchen Cabinetry

  12. Create a template for solid surface countertops (quartz, granite, Silestone, etc). Make sure all appliances, sinks, faucets are onsite.

  13. Installation of countertops

  14. Installation of flooring and base moldings

  15. Installation of appliances

  16. Finish Plumbing and Electrical (fixtures such as can lights, faucets)

  17. Final Touch-Ups, Walk-Through and Punch List